Home - Oil and Gas Pre-Cooler
Oil and Gas Pre-Cooler
Overview Yipu Oil & Gas Pre-Cooler delivers three core values through innovative technologies: This product is particularly suitable for oil-gas field development and refining enterprises, serving as a key equipment for efficient utilization of oil-gas resources, energy conservation, and emission reduction. The typical investment payback period is 1-2 years. I. Market Pain Point Analysis II….
Overview
Yipu Oil & Gas Pre-Cooler delivers three core values through innovative technologies:
- Significant Economic Benefits: Improves light hydrocarbon recovery rate to increase revenue, reduces energy consumption, and lowers operating costs.
- Enhanced Processing Efficiency: Optimizes operating conditions for subsequent treatment equipment, boosting overall system processing capacity.
- Reliable and Stable Operation: Adapts to various oil-gas compositions; intelligent protection ensures long-term stable system operation.
This product is particularly suitable for oil-gas field development and refining enterprises, serving as a key equipment for efficient utilization of oil-gas resources, energy conservation, and emission reduction. The typical investment payback period is 1-2 years.
I. Market Pain Point Analysis
- Low Oil-Gas Processing Efficiency
- Traditional pre-cooling equipment lacks precise temperature control for oil-gas mixtures, affecting subsequent separation results.
- Large fluctuations in oil-gas temperature lead to low light hydrocarbon recovery rates and impaired economic benefits.
- High Energy Consumption and Resource Waste
- Conventional cooling systems have high energy consumption, resulting in persistently high operating costs.
- Valuable components in oil and gas are not fully recovered.
- Poor Equipment Adaptability
- Oil-gas compositions vary significantly across different oilfields, making universal equipment difficult to meet requirements.
- System stability is poor when processing capacity changes, affecting continuous production.

II. System Process Flow
Five-Stage Processing System:
- First-Stage Inlet Pre-Treatment
- Raw oil-gas (20-80℃) enters the inlet separator.
- Initial separation of large liquid droplets and solid impurities.
- Second-Stage Pre-Cooling
- Oil-gas enters the plate-shell heat exchanger.
- Initial heat exchange with the refrigerant significantly reduces the temperature.
- Third-Stage Deep Cooling
- Pre-cooled oil-gas enters the high-efficiency evaporator.
- Temperature is precisely controlled within the set dew point range.
- Fourth-Stage Condensate Recovery
- Cooled oil-gas enters the three-phase separator.
- Effective separation of oil, gas, and water is achieved.
- Fifth-Stage Intelligent Control
- PLC automatically adjusts operating parameters according to oil-gas composition.
- Real-time optimization of system energy efficiency.
III. Working Principle
Multiphase Flow Heat Exchange Technology:
- Adopts heat exchangers with special flow channel design to effectively handle oil-gas mixtures.
- Multi-stage separation technology improves light hydrocarbon recovery rate.
Intelligent Control Strategy:
- Dynamic temperature control based on composition analysis.
- Anti-clogging early warning system.
- Real-time energy efficiency optimization algorithm.
IV. Core Advantages
- High-Efficiency Separation Capacity
- Light hydrocarbon recovery rate increased by 15-20%.
- Oil-gas-water three-phase separation efficiency ≥98%.
- Significant Energy Conservation
- Equipped with high-efficiency variable-frequency refrigeration system, reducing energy consumption by 25%.
- Intelligent thermal management maximizes energy utilization.
- Wide Operating Condition Adaptability
- Processing capacity: 60-10000 Nm³/min.
- Pressure range: 0.05-8.0MPa, adapting to various oilfield conditions.
- Intelligent Operation and Maintenance System
- Predictive maintenance function.
- Remote monitoring and fault diagnosis.
V. Technical Strength
Core Technologies:
- Patented multiphase flow heat exchanger technology.
- Light hydrocarbon recovery optimization technology.
- Wax and scale prevention technology.
Manufacturing Processes:
- Application of corrosion-resistant materials.
- High-pressure system sealing technology.
- Modular skid-mounted design.
VI. Product Series Introduction
Standard Series:
- YP-OGP-200 Series: 60-500 Nm³/min
- YP-OGP-500 Series: 600-2000 Nm³/min
- YP-OGP-2000 Series: 2500-5000 Nm³/min
- YP-OGP-5000 Series: 6000-10000 Nm³/min
Special Configurations:
- Explosion-proof upgraded version.
- Dual-system redundant configuration.
- Intelligent management system.
VII. Application Scenarios
Oilfield Development:
- Oilfield associated gas processing, shale oil-gas pre-treatment, tight oil-gas processing.
Refining and Chemical Industry:
- Refinery gas pre-treatment, pre-treatment for catalytic cracking units.
Storage and Transportation:
- Pre-treatment for oil-gas pipeline transportation, VOC recovery from oil storage tanks.
Environmental Protection:
- Volatile Organic Compound (VOC) recovery, oil-gas recovery devices.
VIII. Detailed Technical Specifications
| Parameter Category | Technical Indicators | Remarks |
|---|---|---|
| Operating Conditions | ||
| Inlet Air Temperature | 20-80℃ | Wide temperature range adaptation |
| Working Pressure | 0.05-8.0 MPa | Standard: 0.7 MPa |
| Gas Composition | Customized on demand | Professional design |
| Performance Indicators | ||
| Pressure Dew Point | ≤2℃~15℃ | Precisely controllable |
| Pressure Loss | ≤0.05 MPa | Low-resistance design |
| Gas Processing Capacity | 60-10000 Nm³/min | Full series coverage |
| Technical Configuration | ||
| Working Cycle | Continuous operation | Stable and reliable |
| Control Mode | PLC programmable control | Fully automatic operation |
| Installation Method | Indoor flat ground, no foundation required | Rapid deployment |
| Utility Requirements | ||
| Cooling Water Pressure | 0.2~0.4 MPa | Industrial circulating water |
| Cooling Water Temperature | ≤32℃ | |
| Power Supply | 380V/50HZ | |
| Structural Parameters | ||
| Equipment Weight | 4100~18500 kg | Heavy-duty equipment |
| Overall Dimensions (L×W×H) | L(1050~8000)×W(2100~3300)×H(2200~3000) mm | Integrated skid-mounted design |