CNG Refueling Station Drying and Dehydration System

Yipu CNG Filling Station Drying & Dehydration System is a high-reliability equipment designed specifically for the high-pressure and safety-sensitive characteristics of the CNG industry. Its outstanding deep dehydration capacity, high automation level, excellent safety design, and stable long-cycle operation performance make it an indispensable key link for ensuring the safe, efficient, and economical operation of…

Yipu CNG Filling Station Drying & Dehydration System is a high-reliability equipment designed specifically for the high-pressure and safety-sensitive characteristics of the CNG industry. Its outstanding deep dehydration capacity, high automation level, excellent safety design, and stable long-cycle operation performance make it an indispensable key link for ensuring the safe, efficient, and economical operation of CNG filling stations, creating long-term and stable value for customers.

I. Market Pain Points

In CNG (Compressed Natural Gas) filling stations, deep dehydration of natural gas is a key link to ensure the safe operation of the station, extend equipment service life, and guarantee vehicle safety. Yipu’s system precisely addresses the following core pain points in the CNG industry:

  1. High-Pressure Ice Blockage and Safety Hazards: This is the most severe challenge in the CNG field. During natural gas compression, pressure and temperature rise sharply, but in subsequent cooling and storage, the temperature drops to ambient temperature. Any trace of moisture will form hydrates (ice) under high pressure (usually 20-25MPa), blocking high-pressure pipelines of dispensers, seals, and vehicle cylinder interfaces, leading to refueling failure and even safety accidents.
  2. Corrosion of High-Pressure Equipment: Moisture combined with CO₂ or H₂S that may be contained in natural gas forms acidic solutions under high-pressure environments, causing extremely severe corrosion to gas storage wells/cylinder groups, compressor cylinders, high-pressure pipelines, and valves. This significantly shortens the service life of these expensive core equipment and brings huge potential risks.
  3. Damage to Vehicle Engines: When CNG containing moisture enters automobile engines, precision components may be worn under the combined action of water and impurities, and ice may form at pressure regulators, affecting the normal operation of vehicles.
  4. Inaccurate Metering and Low Efficiency: Liquid water or hydrates will affect the metering accuracy of flow meters, causing trade disputes. At the same time, ice blockage and frequent maintenance and cleaning lead to low operational efficiency of filling stations and affect revenue.
  5. Demand for Station Automation: CNG filling stations need to operate continuously 24/7, and there is an urgent demand for equipment that can operate fully automatically with remote monitoring to reduce labor costs and achieve rapid fault response.

II. System Process

Yipu CNG Drying & Dehydration System is usually installed at the front or rear section of the compressor (depending on the station process design), with the following workflow:

  1. Gas Inlet Pretreatment: Pipeline natural gas from pressure regulating devices (pressure 0.1-8.0MPa) first enters the system and passes through a pre-filtration unit to remove solid particles and free liquids, protecting subsequent adsorbents.
  2. Dual-Tower Adsorption Deep Dehydration (Core Process):
    • Adsorption Process: The pretreated gas enters an adsorption tower filled with 3A molecular sieves (preferred). Under pressure, water molecules in the gas are preferentially and strongly adsorbed by the micropores of the molecular sieves, achieving deep drying. This process ensures that the gas entering the compressor and high-pressure section is ultra-dry.
    • Automatic Switching: Before the working tower reaches adsorption saturation (single-tower continuous operation for 12-48 hours), the system automatically switches to the standby tower that has completed regeneration through PLC, realizing continuous and uninterrupted supply of dry gas to the compressor.
  3. Regeneration and Cooling Cycle:
    • Heated Regeneration: The saturated tower is regenerated. The system usually adopts closed-cycle regeneration, drawing a portion of dry gas produced by the system itself, heating it to 150-180℃ through a heater, and then back-purging the adsorption tower to desorb moisture from the molecular sieves.
    • Cooling: After regeneration, the high-temperature adsorption tower needs to be cooled with cooled gas (via air cooling or water cooling) to prepare for the next switching. The regenerated gas is cooled to separate and discharge liquid water.
  4. Dry Gas Transmission to Compression Unit: The gas after deep dehydration has a stable atmospheric pressure dew point of -55℃ to -70℃. It then passes through an outlet filter (precision ≤3μm) for dust protection, and finally obtains clean, ultra-dry gas, which is delivered to the CNG compressor for pressure boosting.

III. Working Principle

The core technical principle of this system is pressure swing adsorption and shape-selective adsorption of molecular sieves.

  • Shape-Selective Adsorption: The pore size of 3A molecular sieves (about 3Å) only allows smaller water molecules (2.8Å) to enter and be firmly adsorbed, while effectively excluding most hydrocarbon molecules (e.g., methane is 3.8Å). This selectivity is crucial for CNG applications because it avoids molecular sieve “poisoning” and regeneration difficulties caused by the adsorption of heavy hydrocarbons, ensuring long-term dehydration performance.
  • Pressure Swing Adsorption: The system performs adsorption under relatively high pressure and regeneration under lower pressure (and high temperature). Utilizing the characteristic of molecular sieves having different adsorption capacities under different pressures and temperatures, a periodic “adsorption-regeneration” cycle is formed, thereby continuously producing ultra-dry gas.

IV. Core Advantages

  1. Deep Dehydration, Eradicating Ice Hazards: The outlet dew point is ≤-70℃, which can fundamentally prevent the formation of hydrates in the high-pressure CNG environment, ensure the 24/7 stable operation of filling stations, and eliminate core safety hazards.
  2. Full-Automatic Intelligent Operation: The PLC-based full-automatic control realizes one-key start-stop, automatic switching, and fault alarm, supporting remote maintenance. It perfectly adapts to the 24/7 unattended operation mode of filling stations, significantly reducing operation and maintenance costs.
  3. High Efficiency, Energy Saving and Economy:
    • Closed-cycle regeneration greatly reduces the consumption of product gas used as regenerated gas, improving CNG sales yield.
    • The wide working pressure range (0.1-8.0MPa) enables it to flexibly connect to incoming gas sources of different pressures, with strong adaptability.
    • The low inlet and outlet pressure drop (≤50kPa) reduces pre-stage energy consumption.
  4. Outstanding Reliability and Long Service Life: The single-tower continuous working time is up to 48 hours, reducing valve switching frequency, minimizing equipment wear, and extending service life. The system design pressure (up to 9.0MPa) has sufficient safety margin.
  5. Comprehensive Safety Guarantee: The Exd Ⅱ BT4 explosion-proof rating and IP54/IP65 protection rating ensure the absolute safe operation of the equipment in the flammable and explosive environment of filling stations.

V. Technical Strength

  1. In-Depth Understanding of CNG Process: The system design fully considers the special requirements of the complete CNG process chain from low pressure to ultra-high pressure for dehydration equipment, especially the targeted design for preventing high-pressure ice blockage.
  2. Modular and Serialized Capabilities: Offers a wide flow range configuration from 500 to 20,000 Nm³/h, meeting the needs of CNG filling stations of different scales from standard stations, satellite stations to mother stations.
  3. Core Process Optimization Capabilities: Provides various configuration options such as “air cooling/water cooling” and “closed/open regeneration”, and can provide the most economical and efficient solution according to the specific conditions and operational strategies of the station.
  4. Strict Quality Assurance: Available mechanical test reports and video factory inspections reflect confidence in product quality and a strict control system, ensuring that the industrial equipment delivered to customers is robust and durable.
  5. Intelligence and Interconnectivity: The built-in PLC system and standard communication interfaces can be easily connected to the station control system of filling stations, realizing remote data monitoring and intelligent operation and maintenance management.

VI. Product Introduction

  • Product Category: CNG Filling Station Drying & Dehydration System
  • Brand: Yipu
  • Core Components: Adsorption tower, 3A molecular sieve, regenerated gas heater, PLC electrical control system, switching valve
  • Working Mode: Dual-tower/multi-tower alternation, continuous cyclic operation
  • Control Method: PLC programmable controller full-automatic control, supporting manual intervention
  • Place of Origin: Zhejiang, China

This system is a key pretreatment equipment in the process flow of CNG filling stations, and its performance directly determines the operational reliability, safety, and economy of the filling station.

VII. Application Scenarios

  • Core Applications: Deep dehydration of feed gas before or after the compressor in various CNG conventional filling stations, satellite stations, and mother stations.
  • Pre-Application: Pre-deep dehydration in urban gate stations or pressure regulating stations supplying gas to CNG stations.
  • Extended Applications: Also suitable for other occasions requiring high-pressure dry gas, such as natural gas cylinder filling and high-pressure test gas sources.

VIII. Key Technical Indicators

Indicator CategoryParameter DetailsTechnical and Market Significance
Processing Capacity500 ~ 20,000 Nm³/hCovers the full range of needs from community filling stations to large-scale CNG mother stations
Working Pressure0.1 ~ 8.0 MPaStrong adaptability, can directly connect to incoming pipeline networks of different pressures
Outlet Dew Point≤ -55℃ ~ -70℃Core performance indicator, completely eradicating high-pressure ice blockage hazards in CNG
Adsorbent3A Molecular SieveTechnical key, specially designed for deep dehydration, resistant to hydrocarbon pollution
Continuous Working Time12 ~ 48 h/towerLong-cycle operation, ensuring continuous operation of filling stations and reducing maintenance
Regeneration Time≤ 8 hRapid regeneration, ensuring timely system backup and high reliability
Control and AutomationPLC, Full-Automatic, Fault AlarmCore guarantee for realizing unattended operation and reducing operational costs
Energy Consumption and YieldClosed-cycle regeneration, power 12.3~150kWReduces gas consumption, improves CNG sales yield, and achieves economical operation
Safety CertificationExplosion-Proof: EXD Ⅱ BT4; Protection: IP54/IP65Meets the strict safety specifications of explosive hazardous areas in CNG filling stations

CNG Filling Station Drying & Dehydration System – Technical Specification Sheet

ItemSpecificationItemSpecification
Product CategoryCNG Filling Station Drying & Dehydration SystemWorking MediumOilfield Associated Gas, Shale Gas, Natural Gas, Coalbed Methane, Biogas
BrandYipuPlace of OriginZhejiang, China
Working Flow Rate500~20,000 Nm³/hCore ComponentsMotor, Compressor, Adsorption Tower, Molecular Sieve, Filter, Booster, Cooler, Separator, Heater, Control Valve & Control System
Core AdvantagesStable & Efficient Operation, Full-Automatic Control, Energy-Saving & Environmental Protection, Remote MaintenanceApplication ScenariosCNG Mother Station & Filling Station, Urban Gas & Industrial Fuel, Power Generation Industry, Chemical & Fertilizer Industry
Mechanical Test ReportAvailableVideo Factory InspectionAvailable
Working Pressure0.1~8.0 MPaInlet Temperature0~40℃ (50℃)
Inlet Pressure Dew Point0.6 MPa/-13℃/Water-SaturatedSingle-Tower Continuous Working Time12~48 h
System Design Pressure1.0~9.0 MPaRegeneration Time≤8 h (10 h)
Adsorbent3A/4A Molecular SieveOutlet Atmospheric Dew Point≤-55℃~-70℃
Regeneration Cooling MethodAir Cooling/Water CoolingOutlet Filtration Precision≤3 μm
Power Supply/Power380V/50Hz/12.30~150 kWProtection ClassIP54 or IP65
Inlet & Outlet Pressure Drop≤50 kPaMotor Explosion-Proof ClassExdⅡ BT4
Noise Level≤85 dBRegenerated Gas Heating Temperature150~180℃
Overall DimensionsL: (2500~8000) mmW: (1600~3000) mmH: (2350~2850) mmEquipment Weight2000~7000 kg
Inlet & Outlet Pipe DiameterDN50~DN200
Working Mode“Dual-Tower/Multi-Tower Alternating ‘Adsorption-Regeneration’Continuous Gas Supply”Regeneration Method“Closed/Open Cycle, Depressurization/IsobaricRegeneration/Heated Regeneration”
Control Method“PLC Programmable Controller, Digital Temperature ControlInstrument, Automatic Fault Alarm”Switching ModeManual/Automatic

Packaging, Shipping & Quotation Information

ItemSpecificationItemSpecification
Sales UnitSingle Unit/SetIndividual Package Dimension2500×2000×2850 (L×W×H) mm
Individual Product Gross Weight3000 kgPackaging MethodWooden Case/Triple-Proof Cloth (Waterproof, Mildewproof, Corrosion-Proof)
Quotation$28,000~$100,000